Three Bridges Railway Operating Centre (ROC)

  • Modernisation plan edges forward on Seaford line

    Modernisation plan edges forward on Seaford line

    Posted

    by

    NETWORK Rail has replaced switches and crossings at Southerham Junction, near Lewes, which controls access to the Seaford branch.  New signalling equipment was also installed between Lewes and Seaford during the closure.  The work took place over the weekend of January 19-20. Once commissioned, the equipment will be controlled from Three Bridges Railway Operating Centre…

Latest Issue

Newsletter Signup