Phil Marsh

  • Chinnor & Princes ‘Gronk’ given   Network SouthEast treatment

    Chinnor & Princes ‘Gronk’ given Network SouthEast treatment

    Posted

    by

    THE Chinnor & Princes Risborough Railway has repainted Class 08 No. 08825 (D3993) in Network SouthEast’s colourful livery.  This is reminiscent of No. 08600 Ivor, which was renumbered 97800 when used as the Slade Green depot shunter in the 1980s. No. 08825 is seen at Chinnor on October 15 while awaiting the application of numerals, which were expected…

  • Island Line to remain in rail franchising system after four-year battle

    Island Line to remain in rail franchising system after four-year battle

    Posted

    by

    Vivarail trains for Isle of Wight as part of £26m investment by Phil Marsh THE unique Island Line will remain a heavy rail-operated route thanks to an investment worth £26million to cover new trains, a new passing loop, new platform height, and other infrastructure changes.  The news comes at the end of a four-and-a-half year…

  • ‘Royal Windsor Steam Express’ to return in 2020

    ‘Royal Windsor Steam Express’ to return in 2020

    Posted

    by

    Regular steam operation will return to London Waterloo in 2020 after Steam Dreams confirmed its ‘Royal Windsor Steam Express’ will run again next summer.  Operating every Tuesday until September 3, the trains consist of three one-way, steam-hauled trips from Waterloo to Windsor & Eton Riverside and an evening dining circuit known as the ‘Sunset Steam…

  • East West Rail’s first piece of electrification nears completion

    East West Rail’s first piece of electrification nears completion

    Posted

    by

    The East West Rail project was due to complete its first electrification project by May 6 – rewiring the four-track West Coast Main Line 150 yards either side of Bletchley flyover. The work is required because the track and formation and base slabs of the flyover need to be lifted to permit the refurbishment of…

Latest Issue

Newsletter Signup