Search results for: “4”

  • Collectors’ club 08 in Longmoor guise

    Collectors’ club 08 in Longmoor guise

    Posted

    by

    An N-scale Class 08 diesel shunter in the guise of No 878 Basra in Longmoor Military Railway livery is the latest limited-edition model to be produced exclusively for Bachmann Collectors’ Club members. Just 504 have been produced, and they will cost £109.95, each one coming with a certificate of authenticity.  For more News and Features,…

  • New high-tech product range from Train-Tech

    New high-tech product range from Train-Tech

    Posted

    by

    A new UK-designed and built range of products aiming at bringing yet more realism to layouts has just been announced by Train-Tech. A ‘Smart Screen’ system enables miniature working animated screens to be triggered by a range of inputs including switches, DCC commands and even track sensors, that can be used to show different screens…

  • Guide to Modelling April 2019

    Guide to Modelling April 2019

    Posted

    by

    Check out what’s coming up in the latest issue of The Railway Magazine’s Guide to Modelling!

  • Video: A Tour of Digitrains | A Model Railway Shop Specialising in DCC

    Video: A Tour of Digitrains | A Model Railway Shop Specialising in DCC

    Posted

    by

    Digitrains is a model railway shop based in Lincoln. They are specialists in digital command control (DCC). Using DCC offers a huge new range of possibilities for a model railway track, including greater control of locos, amazingly accurate sounds and plenty more features. However Digitrains doesn’t just offer DCC services, it’s also a one-stop shop…

  • ‘Hoover’ Royal Oak saved by Great Central Railway

    ‘Hoover’ Royal Oak saved by Great Central Railway

    Posted

    by

    CLASS 50 No. 50017 Royal Oak has been acquired by the Great Central Railway (GCR) from Boden Rail, Eastcroft, Nottingham.  This followed a few days when the loco’s future was in doubt, with various means of disposal being considered, including dismantling for spares.  A sale fell through in late-January, and as funds and space were required…

  • ELR’s Type 2 back in action after lengthy overhaul

    ELR’s Type 2 back in action after lengthy overhaul

    Posted

    by

    CLASS 24 No. D5054 Phil Southern returned to traffic during the East Lancashire Railway’s (ELR) Sulzer Theme Day on February 16.  It has undergone a heavy overhaul over the past nine years, which included a generator overhaul, to avoid failure, as well as attention to the bogies and power unit. Following completion, repaint in BR green…

  • Lee Valley route capacity upgrades near completion

    Lee Valley route capacity upgrades near completion

    Posted

    by

    WORK to boost capacity on the Lee Valley route in north-east London is on schedule for completion by May 2019.  The £170million programme of work includes a third track between Stratford and the new station at Meridian Water, and additional platforms at Tottenham Hale and Northumberland Park, which will allow an extra two trains per…

  • Modernisation plan edges forward on Seaford line

    Modernisation plan edges forward on Seaford line

    Posted

    by

    NETWORK Rail has replaced switches and crossings at Southerham Junction, near Lewes, which controls access to the Seaford branch.  New signalling equipment was also installed between Lewes and Seaford during the closure.  The work took place over the weekend of January 19-20. Once commissioned, the equipment will be controlled from Three Bridges Railway Operating Centre…

  • Upgraded Lime Street is top station in Britain

    Upgraded Lime Street is top station in Britain

    Posted

    by

    LIVERPOOL’S recently upgraded Lime Street station is the highest rated of Britain’s major stations by passengers in the latest National Passenger Rail Survey.  Scoring a 93.8% satisfaction rating, Lime Street narrowly beat St Pancras International (93.6%) and King’s Cross (92.9%) to top the list for Network Rail managed stations. NETWORK RAIL Read more News and…

  • £13m refurbishment for Glasgow Clyde bridge

    £13m refurbishment for Glasgow Clyde bridge

    Posted

    by

    A TWO-YEAR, £13million renovation project is underway on one of Scotland’s busiest railway bridges.  The 200 metre-long Clyde Bridge on the approach to Glasgow Central is used by up to 1,300 trains every day, serving the West Coast Main Line, Lanarkshire, Inverclyde and Ayrshire.  The Grade A-listed structure will undergo extensive refurbishment and repair works,…

Latest Issue

Newsletter Signup