ALMOST a mile of track has been replaced in Bishopsgate Tunnel, on the approach to London Liverpool Street, Britain’s third busiest station.
This view highlights the difficulty of renewing infrastructure on the approaches to London Liverpool Street. Network Rail engineers are seen replacing track in Bishopsgate Tunnel during one of six weekend closures. NETWORK RAIL
The renewal of more than 1,550 metres of track, sleepers and ballast was carried out over six consecutive weekends, and was complicated by the confined space, limited ventilation, a need to maintain timetabled service during the week, and close proximity to a main sewer.
From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.