80151 return delayed at Bluebell Railway

Posted

by

RIDDLES ‘4MT’ 2-6-4T No. 80151 is back in operation following overhaul at the Bluebell Railway. 

The Brighton-built loco has not worked since withdrawal for overhaul in May 2012, and over the past four years has received an extensive overhaul and boiler repairs to the tune of almost £360,000.

Article continues below…
Advert

Nearly half of this was contributed by the Bluebell Railway Trust and the loco’s owning group, the 80151 Locomotive Company.

A full repaint has been completed by Heritage Painting, and on July 3 the ‘Standard Tank’ was undergoing its first trial runs, including a loaded test run.

BR ‘4MT’ No. 80151 works a loaded test train towards Sheffield Park at the Bluebell Railway on July 3. The loco is expected to join the roster this summer. DAVID CABLE

It was planned to have the loco in revenue-earning traffic on July 27, but this was delayed by what the Bluebell Railway described as “a lack of resources”.

Article continues below…
Advert

The precise nature of this could not be ascertained as this issue of The RM went to press.  

Read more News and Features in the August 2019 issue of The RM –on sale now!

Article continues below…
Advert

Advert

Railway Reads

From the history of steam through to 21st century rail transport news, we have titles that cater for all rail enthusiasts. Covering diesels, modelling, steam and modern railways, check out our range of magazines and fantastic subscription offers.

Latest Issue

Newsletter Signup